• 1/5

ZH1500-Mobile Normalizing Equipment

产品详情



★ Integrated normalizing operation device

★ Automatic opening and closing docking induction coil.

★ 3-axis robotic arm lifting system.


ZH1500, Mobile Normalizing Equipment, is the latest generation of mobile normalizing equipment developed by our company in collaboration with China Railway Beijing Bureau Group Co., Ltd.. It features a remote-controlled boom and an integrated machine head design, enabling fully automated normalization processes. This significantly enhances on-site operational efficiency, improves heat treatment quality, and drastically educes personnel costs and the workload of operators.


The ZH1500 adopts a remote controlled mechanical arm and an integrated normalizing operation device, which can fully automate the normalizing process, significantly improving on site operation efficiency and heat treatment quality, while dramatically reducing the workload of operators. The ZH1500 has obtained multiple patented technologies and has been successfully applied in various projects such as the Beijing-Zhangjiakou High-Speed Railway and Sichuan-Tibet Railway, earning widespread praise from users.


Parameters

  • Mechanical arm and operation device adopt hydraulic drive, which can maintain pressure during operation.

  • The entire machine adopts a containerized structure, facilitating lifting, unloading, and transportation.

  • Highly automated, allowing for single-person operation and one-click normalizing.

  • Equipped with an air blast device, capable of completing the cooling process after heating.

  • Equipped with rail head and rail base temperature measurement devices, simultaneously monitoring the heating tempera­tures of both the rail head and rail base.

  • Generator power: 160kW

    Intermediate frequency power supply: 100kW

    Chiller power: 8HP

    Hydraulic station power:9kW

  • Equipped with data acquisition and storage capabilities, allowing for the collection and storage of data such as healing and cooling temperatures, air blast fow rates, and other relevant parameters.

  • Under operational conditions, the equipment's overall dimensions comply with the clearance requirements for standard gauge railway locomotives as stipulated in GB146.1.

  • Normalizing method: dual-frequency normalizing with docking coil, closed magnetic field for uniform heating.